Tag: Lui Tuck Yew

  • Lee Hsien Loong Announces Cabinet Reshuffle

    Lee Hsien Loong Announces Cabinet Reshuffle

    Prime Minister Lee Hsien Loong has made several changes to his Cabinet and other political appointments, including the promotion of Mr Masagos Zulkifli (Senior Minister of State, Ministry of Home Affairs and Ministry of Foreign Affairs), to full Minister.

    This is a part of continuing leadership renewal, according to a statement from the Prime Minister’s Office on Wednesday.

    Mr Masagos Zulkifli will be promoted to full Minister with effect from Thursday, April 9, 2015. He will be appointed Minister in the Prime Minister’s Office and will continue in the Ministry of Home Affairs and Ministry of Foreign Affairs as Second Minister in both ministries.

    The changes to the Cabinet are summarised below:

    Mr Chan Chun Sing will be appointed Minister in the Prime Minister’s Office. He will relinquish his appointments as Minister for Social and Family Development and Second Minister for Defence with effect from April 9, 2015.

    Mr Lim Swee Say will be appointed Minister for Manpower and will relinquish his appointment as Minister in the Prime Minister’s Office on May 4, 2015.

    Mr Tan Chuan‐Jin, currently Minister for Manpower, will be appointed Minister for Social and Family Development on 9 April 2015. He will hold both portfolios until he relinquishes his appointment as Minister for Manpower on May 4, 2015.

    Mr Lui Tuck Yew will be appointed Second Minister for Defence with effect from April 9, 2015. He will continue as Minister for Transport.

     

    Source: http://news.asiaone.com

  • Lui Tuck Yew: ERP Revenue Fell Last Year

    Lui Tuck Yew: ERP Revenue Fell Last Year

    The Government collected S$152 million in Electronic Road Pricing (ERP) revenue last year, which is a dip from the S$160 million consistently collected in preceding years, said Transport Minister Lui Tuck Yew to Parliament on Wednesday (Mar 11).

    This was in response to questions from several MPs who wanted to know if ERP rates could be adjusted on certain roads.

    Mr Lui said the smaller revenue is in part due to the opening of the Marina Coastal Expressway, which saw ERP charges along both the MCE and ECP, lowered, for three consecutive quarters.

    He explained that the optimal speed for expressways is 45 to 65km/hour. When speeds reach above 65km/hr, ERP charges are lowered or removed. Correspondingly if speeds go consistently below 45km/hr, rates are raised, for the particular time belt. The same goes for arterial roads.

    The speed parameters for that is between 20 and 30km/hr. If speeds are consistently above the upper threshold, ERP charges will be reduced, and likewise raised, if it is consistently below the lower threshold.

    Mr Lui added that charges for entry into Orchard Road will remain, on Saturdays.

    “We still feel that there is a need to have this on Saturday afternoon. And for those who find the ERP charge is a burden, then maybe the possibility is for them to shop on Sundays instead because Sundays is entirely free and the traffic speeds a little bit better,” he said.

     

    Source: www.channelnewsasia.com

  • Lui Tuck Yew: Displeased Over Disruption, No Women-Only Cabins

    Lui Tuck Yew: Displeased Over Disruption, No Women-Only Cabins

    Key performance indicators such as the number of train withdrawals and service delays have been improving in recent years as a result of a change to the approach to maintenance adopted by public transport providers.

    “But while the statistics show improvement, the recent incidents are a stark reminder that we still have a significant way to go”, Transport Minister Lui Tuck Yew said in Parliament on Wednesday (Mar 11).

    Mr Lui noted that for most of 2014, public transport operators have made “significant inroads in improving reliability”. For instance, the number of train withdrawals on the North-South (NSL) and East-West Lines (EWL) were halved to 1.1 per 100,000 train-km, compared to 2.2 in 2013 – back to 2007 standards.

    “I feel that we can do better in the coming years as this improved rate is still double that of the North East Line and Circle Line,” he qualified.

    Service delays lasting more than five minutes have also improved on the NSL and EWL, down to 1.3 in 2014 compared to 1.6 in 2012 – an improvement of close to 20 per cent, the minister said.

    Similarly, the withdrawal rate for the Bukit Panjang LRT had come down to 4.5 per 100,000 car-km in 2014, compared to 6.1 in 2012. For the Sengkang-Punggol LRT, it was 0.7 in 2014, compared to 1.5 in 2012, he said.

    Commuters were more satisfied with public transport last year. Survey results involving over 4,000 people showed satisfaction levels improving from 88.5 per cent in 2013, to 91.3 per cent last year.

    Satisfaction with train services hit 92.8 per cent, after a four-year decline, while for buses, it was up for a second year to reach 90.2 per cent, from 88.3 per cent in 2013.

    Mr Lui said: “It reflected the prevailing sentiments that commuters were starting to feel the effect of the improvements and investments that we have made in our buses and trains over the last few years.

    “And for the MRT, I must point out that we look at a range of attributes, from waiting time, to reliability to comfort and so on, and the attributes that had scored the highest for at least the past two years were safety and security.”

    ‘I AM MOST UPSET’

    However, a recent spate of breakdowns has shown that much work still needs to be done, said Mr Lui.

    “While I can accept the occasional breakdown or even a more severe disruption if it occurs very rarely, I am most upset with the current situation in the last few weeks,” he said.

    “The operators must persevere and redouble their efforts to do better. They need to intensify their maintenance regime, undertake additional preventive and detection measures, as well as improve their processes to enable prompt and effective response to maintenance issues,” he said, adding that his ministry will work with these companies to continue with track renewal and mid-life upgrades of their trains.

    The Land Transport Authority (LTA) will augment SMRT with additional engineering expertise where required, and will also step up audits of the latter’s maintenance procedures and resources.

    “In the event of a disruption, like in the Bukit Panjang LRT incident, LTA will require SMRT to deploy more service ambassadors to better assist commuters,” Mr Lui said. “I would like to assure Members that we will spare no effort to find out the cause of the recent spate of breakdowns, and take the necessary steps to stem the problems.”

    In January, the LTA announced a higher bar set for Singapore’s rail network to cut waiting times and disruptions. For instance, it plans to further tighten the Operating Performance Standards (OPS) for train frequencies during morning, evening and shoulder peak periods for the North-South and East-West Line, North East Line and Circle Line. This will be introduced progressively from 2016.

    By 2019, there will be 99 new trains, for the North-South and East-West Line, North East Line and Circle Line. Mr Lui said: “We are constructing these new lines at a pace unprecedented in Singapore’s history. By 2030, our rail network will be almost as dense as New York and London, and we would have achieved this in under 50 years, compared to the more than 100 years that it took the two cities.”

    “The overall train fleet will increase by about 50 per cent and we can expect that peak period wait times will come down by 25 per cent on average across all train lines,” he added.

    WHAT ABOUT WOMEN-ONLY CABINS?

    In response to suggestions by Members of Parliament Lily Neo and Low Thia Kiang to deploy women-only train cabins, Mr Lui said this idea had been raised and looked at carefully before.

    “There are practical difficulties and challenges, such as how to and how strictly to enforce the rule, and also how this could sub-optimise the capacity of our trains,” the minister said.

    “From the experience of other systems, the women-only cabins are often utilised less, meaning that more commuters will have to crowd into the other cabins or wait for the next train.”

     

    Source: www.channelnewsasia.com

  • Commuters Slam LTA And SMRT, Asks Lui Tuck Yew To Follow Suggestion Khaw Boon Wan Made To WP In Parliament

    Commuters Slam LTA And SMRT, Asks Lui Tuck Yew To Follow Suggestion Khaw Boon Wan Made To WP In Parliament

    It was reported that yesterday alone (3 Mar), SMRT was hit by two train service incidents, both during peak hours.

    In the early morning, a signalling fault at HarbourFront station on the Circle Line stopped all trains between Haw Par Villa and HarbourFront. And in the evening, track faults disrupted services on the East-West Line. Track faults at Clementi and Lakeside stations caused trains to slow down from Queenstown to Boon Lay. Commuters were advised to add 20 minutes to their travelling time between Bugis and Jurong East stations in both directions as bridging bus services were activated. Services resumed about 2 hours later.

    Many commuters were, understandably, angry with SMRT and lashed out at SMRT on social media (‘SMRT: Recent train incidents were ‘technically unrelated’‘).

    In all, there were 5 train disruptions in the spate of 9 days. LTA also joined in to condemn SMRT, saying that the situation is “unacceptable”.

    On LTA’s Facebook page yesterday, it said [Link]:

    “Today’s disruptions on the Circle and East-West Lines are the latest in a recent spate of incidents on the SMRT rail network. Commuters have been severely inconvenienced again. This is unacceptable.

    LTA has directed SMRT to investigate the various disruptions and give a full account of them. LTA is also conducting our independent investigations.

    LTA will be working with SMRT on the immediate remedial actions to turn around the situation. We expect the SMRT Board and management team to put in maximum effort and resources. We intend also to review again SMRT’s management of resources and processes for the maintenance of the rail system.”

    SMRT CEO Desmond Kuek was forced to come out to make, yet, another public apology.

    However, commuters were still not pleased. They also took the opportunity to slam LTA on its Facebook page:

    Shao Wei Chui Dear LTA, you most certainly do not keep my world moving. You keep mentioning that it’s “unacceptable” but so what? All that happens is a slap on a wrist on the transport companies and a fine but nothing changes and the fares go up to cover the fine

    Leon Chow: Don’t be a joke. If you all bother, things would not have gone out of hand. Useless jokers

    Shibly Mahmat: After investigate then what? Increase the fares again citing doing this for better service. Thats what you guys have been saying. But has the services ever improve? As far as all of us are concern, train disruptions due to faults are at an all time high now..is this your idea of better service?

    Evonne Sim: LTA, what can/will u do besides telling us this is unacceptable. How many times u want SMRT to investigate/explain! How many times we have to go thru these inconvenience over & over again! n what u going to do besides having endless meetings with no outcome? stop FINE SMRT as it will not solve any problem other than increasing their so-called operating cost n resulted fare hike. don’t juz lip service, we want to see action by the authority…

    Edmund Khor: you said you wanted to improve service.. but 4 years already, and it keeps getting worse. talk is cheap..

    Ken Ong: It’s all wayang. Lta n smrt management are pretty useless. They should all step down n resign.

    Calvin Xun Hui Wong: Another classic scene of relevant authority ‘takes action’ and ‘fine’ transport company, then on the other hand transport company takes the opportunity to raise fares with support from PTC (AKA the authority) to ‘improve transport system’. Its like LTA condemning SMRT but making the commuters pay their fines. So this is ‘action taken against SMRT’ ?

    Some even asked Transport Minister Lui Tuck Yew to do what National Development Minister Khaw had suggested to WP MPs during the AHPETC saga, which Mr Khaw blamed WP:

    Rongjing Zeng: “In Japan, the chairman and CEO would call a press conference, take a deep bow and, in the good old days, they may even commit hara-kiri.” – KBW

    Gordon Teo: Why Tuck Yew haven’t hara kiri yet ah?

    Jabez Chai: What is our Transport’s Minister doing about it after so many years of breakdown and while doing nothing… He are being paid millions of dollars….

    Some questioned the rationale of approving the recent transport fare hike when the train services are “unacceptable”:

    Vasanthan Kanagasundaram: Could you also review why you think you deserve a fare hike.

    Ray Ng: Dear SMRT, the upcoming fare hike in April is not written in stone. please have the conscience to delay the fare hike in light of the recent train faults

    Robin Low: LTA, please justify why you allow price hike when there is no improvement and still lots of profits.

    Still, others think that it’s the fault of the government to increase the population of Singapore quickly by importing too many foreigners:

    Jeffrey Lim: So y import so many foreigners in the first place, if our mrt system can’t cope with it???

    Tan Cheng Siong Leslie: Nothing new. Cant imagine if population is 6.9, those top ‘elite’ mgmt dun care coz they dun take public transport, to them say a few words of apology n conduct investigation for show fat salary still goes to their pocket. TALK ONLY la.. Increase fare some more? Aiyooo, i so paiseh to say tat!

    Daniel Tan: Don’t blame SMRT, LTA. Blame the people who made the decision to overcrowd Singapore.

    Finally, one commuter said:

    “Main reason why I still hold on to my motorbike. Screw public transport. Now COE high, MRT haven’t improve, wanna encourage to take public transport. Screw that! I’ll never EVER let go of my motorbike!!”

     

    Source: www.tremeritus.com

  • 200 Complaints Lodged With Regard To The English-Speaking Competency Of Bus Captains

    200 Complaints Lodged With Regard To The English-Speaking Competency Of Bus Captains

    The Land Transport Authority (LTA) has received around 200 complaints regarding the language abilities of bus captains, most of which were on their ability to converse in English.

    Transport Minister Lui Tuck Yew revealed this in a written reply to MP for Aljunied GRC Muhamad Faisal’s parliamentary question on the number of public feedback received with regard to the language abilities of bus captains.

    Mr Lui added that all bus captains are required to have a basic competency in conversational English before being deployed. Once LTA has received legitimate feedback, they will then inform the relevant public transport operators, who will send the bus captain for a refresher course.

    The bus captain will only be redeployed once he has passed a language test.

     

    Source: www.channelnewsasia.com